The paper proposes a scheme for reforming the 354 voltage transformer station in a certain stevedores area at Shanghai Port.
The cut to be excavated lies close to a large-scale transformer station. There are high voltage wires of more than 80 over the cut and several underground water pipes crossing with the cut.